Site surveys

Air conditioning site survey: what happens and how to prepare

A survey turns a rough idea into an accurate quote by checking room sizes, heat sources, pipe routes, electrics and where the outdoor unit can go.

Air conditioning cannot be quoted accurately over the phone, because the things that drive the work are only visible on site: the pipe route, the wall construction, the outdoor unit position and the electrical supply. That is why we always start with a free site visit rather than a phone estimate.

This guide explains what happens on a survey, what you will be asked, and how a little preparation gets you a clearer, more accurate quote.

Planning a new system? See our air conditioning installation service.

Need this sorted?

Get a quote from TMS for air conditioning and refrigeration installations.

Air conditioning site survey: what happens and how to prepare

What a survey is for

A survey answers four questions: how much cooling and heating each room needs, what type of indoor unit suits it, where the outdoor unit can go and how the pipes, drain and power will get between them. Once those are settled, the quote can list the equipment and the work involved instead of relying on assumptions.

Questions you will be asked

  • Which rooms you want cooled or heated, and how you use them
  • Whether you want cooling only or year-round heating as well
  • Any preferences on unit type, colour, position or brand
  • How many people use each room and what equipment runs in it
  • For businesses, opening hours and any rooms that must stay cool around the clock

What gets measured and checked

The engineer measures each room, notes window sizes and orientation, ceiling heights and any rooflights or glazing that add heat. Heat from people, lighting and equipment also counts, which matters a lot in offices, kitchens, salons and comms rooms.

They also look at wall construction, where holes can be drilled, where the condensate can drain and whether a pump is needed. The electrical supply and consumer unit are checked to see whether a new circuit is needed.

The outdoor unit and pipe route

This is often where most of the discussion happens. The outdoor unit needs a solid base or bracket, airflow, a sensible pipe route and safe access for servicing, while staying away from bedroom windows and boundaries where possible. The engineer will suggest options and explain the trade-offs.

For flats, listed buildings and some commercial premises, the survey also flags whether freeholder consent or planning permission is likely to be needed.

How to prepare

  • Decide which rooms matter most, so the survey can focus there
  • Clear access to the walls and windows in those rooms, the loft and the consumer unit
  • Think about where you would and would not accept an outdoor unit
  • Have lease details or managing agent contacts to hand if you live in a flat
  • Note any times the rooms get uncomfortably hot, such as afternoons in a south-facing room

What you get afterwards

You should receive a written quote that breaks down the equipment and labour, names the models proposed and explains what is and is not included, such as making good, electrical work and condensate drainage. Our guide to choosing an air conditioning installer lists what to compare between quotes.

Surveys for businesses

Commercial surveys go into more detail on heat from equipment, occupancy and opening hours. In offices the engineer will look at computer equipment, meeting rooms and glazing; in shops at lighting and display refrigeration; in comms rooms at equipment heat and whether standby cooling is needed. Landlord consent, out-of-hours working and access arrangements are also discussed, because they affect how the installation is planned.

Questions worth asking on the day

  • Why this unit size and type for this room?
  • Where exactly will the pipes, drain and cable run?
  • Will a condensate pump be needed?
  • Is any electrical work or making good included?
  • What servicing will the system need afterwards?

After you accept the quote

Once you go ahead, the next steps are agreeing an installation date, confirming any consents and making sure access is available on the day. If anything on site has changed since the survey, such as new decoration or furniture where a unit was planned, mention it before installation so the plan can be adjusted. Our step-by-step installation guide explains what happens on the day itself.

Common surprises a survey uncovers

Some things only appear on site: a wall that turns out to be solid stone, a consumer unit with no spare capacity, an outdoor position that looks fine but has no access for servicing, or a drain route that will not fall. Finding these before installation day is the whole point, because it avoids delays and changes to the price once work has started.

Want a professional to handle it?

Send us a message

Free, no-obligation · Friendly local team · 24h response

FAQs

Common questions

Do you charge for an air conditioning survey?

No. We always start with a free site visit so we can give an accurate written quote.

How long does a survey take?

It depends on the number of rooms and the building. A single room in a house is quick; larger homes and commercial premises take longer.

Can you quote without visiting?

Not accurately. Pipe routes, wall construction, electrics and outdoor unit position all affect the work, and they need checking on site.

Do I need to be there for the survey?

Yes, ideally, so you can discuss unit positions and the outdoor unit location with the engineer and agree what suits you.

What should I compare between quotes?

Check each covers the same equipment, pipework, drainage, electrics, commissioning and making good, so you are comparing like for like.

Talk it through with an engineer.

No call centre — you speak to Ted directly.

Call WhatsApp Get a quote