Air conditioning for home extensions: plan it in at build stage

Extensions with big glass and open layouts often overheat; planning air conditioning before plastering gives neater pipe routes and more system choice.

Rear extensions, kitchen-diners and garden-facing living spaces are usually the warmest rooms in the house. Rooflights, bi-fold doors and large glazed walls let in plenty of light and plenty of solar heat. Many owners only think about cooling after the first summer, when retrofitting is harder and less tidy.

This guide explains how to plan air to air air conditioning into an extension while the building work is still under way, and what to think about if the extension is already finished.

Planning a new system? See our air conditioning installation service.

Need this sorted?

Get a quote from TMS for home air conditioning.

Air conditioning for home extensions: plan it in at build stage

Why extensions overheat

Large areas of glazing, especially south or west facing, admit a lot of solar heat. Rooflights and lantern roofs add to it, and open-plan layouts often join the extension to a kitchen with ovens and appliances running. Insulation keeps that heat in during the evening. The result is a room that can be several degrees warmer than the rest of the house.

When to involve an installer

The best time is once the layout is agreed but before walls are plastered and ceilings boarded. At that stage refrigerant pipes, condensate drains and cables can be run inside walls, floors or ceiling voids, known as first fix. The indoor and outdoor units are then fitted at the end of the build, second fix.

Bring your drawings to the survey. Your builder, electrician and installer should agree routes and the electrical supply so nothing clashes with steels, drainage or underfloor heating.

Sizing glazed and open-plan rooms

A rule of thumb based on floor area underestimates the load in a heavily glazed room. Orientation, glass area, rooflights, shading and kitchen appliances all affect how much capacity is needed. A proper survey takes these into account. Our guide to sizing air conditioning explains the principles.

Which system suits an extension?

Ceiling cassettes and ducted units are much easier to fit while the ceiling is open, which is the main argument for planning early. Retrofitting them later usually means cutting into finished ceilings.

  • Wall-mounted split: simple and economical, best on a solid wall with a short route outside
  • Ceiling cassette: discreet and spreads air well in large open-plan rooms, needs a ceiling void
  • Ducted system: almost invisible with only grilles showing, needs a deeper void planned at build stage
  • Multi-split: lets the extension and another room share one outdoor unit

Where the outdoor unit goes

Think about the outdoor unit position at the same time as the patio and garden layout. It needs airflow, a solid base or bracket, a drain route for water in heating mode and access for servicing, and it should be away from bedroom windows and seating areas. Planning rules may apply; our planning permission guide covers the general position.

Working alongside your builder

Coordination is what makes a hidden installation work. Agree who provides the electrical supply and isolator, where the condensate will discharge, and whether any steel beams or joists sit on the planned pipe route. Ask the builder to protect capped pipe ends and to leave access panels where joints sit inside a ceiling. Photographs of the first-fix routes before boarding are useful for anyone who works on the room later.

Heating as well as cooling

Air to air systems also heat, which is useful in extensions where the existing radiator circuit is stretched or underfloor heating is slow to respond. Many owners use the system for quick warmth in spring and autumn and for cooling in summer.

Cost factors

  • System type and number of indoor units
  • Capacity needed for the glazing and room size
  • Length and difficulty of pipe runs
  • Whether first-fix work is done during the build or retrofitted later
  • Condensate route and whether a pump is needed
  • Electrical supply work and outdoor unit mounting

Mistakes to avoid

  • Leaving cooling until after plastering and decorating
  • Sizing on floor area alone for a heavily glazed room
  • Forgetting a condensate route when pipes are hidden in walls
  • Placing the outdoor unit beside the new patio seating
  • Not leaving access panels for hidden joints and units
  • Letting other trades block the outdoor unit position with a shed, bin store or planter

When to bring in a professional

Book a survey as soon as your extension drawings are settled. We can agree first-fix routes with your builder and come back to fit and commission the units once the room is finished. If the extension is already complete, a wall-mounted split or multi-split is usually the neatest retrofit.

Want a professional to handle it?

Send us a message

Free, no-obligation · Friendly local team · 24h response

FAQs

Common questions

When should I plan air conditioning for an extension?

Before walls are plastered and ceilings boarded, so pipes, drains and cables can be hidden during the build.

Can air conditioning be added after the extension is finished?

Yes. A wall-mounted split or multi-split is usually the neatest option, with pipes run through the wall or in trunking.

What is first fix for air conditioning?

It is running the refrigerant pipes, drain and cables during the build, before finishes go on. The units are fitted later at second fix.

Will one unit cool a large open-plan extension?

Sometimes, but glazed open-plan rooms often need more capacity or two indoor units. A survey works out the load properly.

Can air conditioning heat my extension too?